Project Detail
| Job Name | HAZEL AVENUE BRIDGE WIDENING |
| Job Location | SACRAMENTO, CA |
| Date of Completion | JUNE 2010 |
Narrative
| Interesting Facts, Uniqueness,
Special features, Notable design, Record erection time, Modifications etc. |
THIS BRIDGE IS THE WIDENING OF AN EXISTING CAST IN PLACE BRIDGE FOR HAZEL AVENUE OVER THE AMERICAN RIVER. ORIGINALLY THE DESIGNERS HAD PRECAST PANELS WITH A RIPPLE MOTIEF HUNG ALONG THE EDGE OF THE NEW WIDENING BUT CON-FAB VALUE ENGINEERED THE MOTIEF TO BE CAST INTO THE SIDE OF THE FACE OF THE EXTERIOR GIRDER WITH GREAT SUCCESS |
Picture Requirements
| In Production | INCLUDED |
| Erection | INCLUDED |
| Completed | REQUIRED |
Bridges
| Time to erect | Two weekend days |
| Number of Girders | 16 |
| Type of Girders | Caltrans Bulb tee |
| Length of Girders | Max 121ft |
| Type of bridge | Spliced girder |
| Depth of Girders | 84.625” |
| Weight of Girders | 173,000# |
Awards
| Name and details | None |
Articles
| Name and details | None |