Redding, California
July 2002
This bridge linked the main street over Cottonwood Creek, between the cities of Red Bluff and Redding. The structure was continuously post-tensioned from dead deck load and the applied live load.
Erection Time: 5 Days
36 precast girders
Length: 136ft
Width: 4ft
Depth: 6ft. 1 in.
Weight of each – 145,000 lbs