Sacramento, California
2007
This parking structure wraps around two sides of a 20 storey steel office building. It has a 7” reinforced concrete deck with 17’-0” bay spacing and a structural depth of 34” overall
Erection Time: 18 Days
78 Columns
288 Beams
54 Girders